聯接防水 材料建筑屋頂房頂樓頂防水補漏堵漏 直供
base surface shall be flat, clean, firm, without leakage and open water. If there are irregularities and cracks, leveling is required first.
2.將液料和粉料按比列攪拌成均勻狀態。
Mix material of liquidandpowderinto a uniform state proportionally.
3.用刷子或滾筒將漿料均勻的在處理好的基面上涂刷。施工過程中保持間歇性的攪拌,以防沉淀。
Brush slurryevenly on the treated base surface with a brush or drum. Keep intermittent stirring during construction to prevent precipitation
4.做完第一遍后必須等待其略為干固后再做第二層,干固標準是剛好不粘手,一般需要1~2小時。如果第一層完全干透后再施工第二層時,應該噴灑少量清水,保持基面濕潤。
After thefirst brush completed, must waituntil it becomea little dry , thestandard is just nothand-sticky, generally takes1~2 hours. Ifits dry completely, which beyond the level to commit the second brush, should spray a littlewaterto make itwet.
5.每一層不宜刷的太厚,以便利于養護和固化。施工完畢上一道工序后方可進行下一道工序。
Each layer shouldnotbe too thick t